16.7 MW Cogeneration Power Plant
Boiler Capacity: 87 AIA First time in India
Highlights of the Project
- Installed 87 ata 515 Deg.c high pressure and high temperature boiler is first of its kind in indian sugar industry, and the same is running successfully.
- Whole project was commissioned in 14 months period.